PME are currently engaged on a major project in the South West of England in the plant room of a well known brewery removing heavy oil steam boilers and converting to a CHP driven plant.

Case studies

Private, commercial and public-sector contractors: a wide range of clients already trust our expertise in planning and project management. A selection of our completed projects is listed here:

Large art gallery in Trafalgar Square

removal of redundant CHP generator

A project to remove a redundant CHP generator, and make safe the services

  • Feasibility studies method statements and risk assessments
  • Site supervision
  • Removal of all services as required and made safe
  • Cable ducting
  • All lifting equipment supplied direct from our works
  • Electrical removal work work

 

 

Client

A manufacturer of CHP (combined heat and power) generators

 

 

Major high level works in Park Lane

  • Removal of a large generator from a hotel in Park Lane London
  • This was situated at roof level, we carried out all planning for these works including road closures and traffic management.
  • We later returned to the site and installed a new generator to the basement and lifted heat rejection radiators to the roof level.

 

Client

A large generator company based in the North of England.

 

 

Other projects at a glance

 

Removing a MTU V16 engine to be exported for overhaul as part of planned maintenance. This engine was situated in the sub basement of a well known London hospital. PME removed the entire generator including skid frame and alternator as part of the planned maintenance the alternator was being overhauled at the same time.