PM Engineering Kent Ltd
PM Engineering Kent Ltd

Contact details

PM Engineering Kent Ltd

Unit 10

Bank Farm Business Est

Bank Road

Aldington

Kent

TN25 7DF

 

Tel: 01233 720474

 

Alternatively, please use our contact form

Office hours

Our office hours are Monday to Friday  0830 hrs to 1700 hrs however should you call outside of these hours our automated answering system will direct your call to the appropriate person should you leave a message.

PME are currently engaged on a major project in the South West of England in the plant room of a well known brewery removing heavy oil steam boilers and converting to a CHP driven plant.

Case studies

Private, commercial and public-sector contractors: a wide range of clients already trust our expertise in planning and project management. A selection of our completed projects is listed here:

Large art gallery in Trafalgar Square

removal of redundant CHP generator

A project to remove a redundant CHP generator, and make safe the services

  • Feasibility studies method statements and risk assessments
  • Site supervision
  • Removal of all services as required and made safe
  • Cable ducting
  • All lifting equipment supplied direct from our works
  • Electrical removal work work

 

 

Client

A manufacturer of CHP (combined heat and power) generators

Major high level works in Park Lane

  • Removal of a large generator from a hotel in Park Lane London
  • This was situated at roof level, we carried out all planning for these works including road closures and traffic management.
  • We later returned to the site and installed a new generator to the basement and lifted heat rejection radiators to the roof level.

 

Client

A large generator company based in the North of England.

Other projects at a glance

 

Removing a MTU V16 engine to be exported for overhaul as part of planned maintenance. This engine was situated in the sub basement of a well known London hospital. PME removed the entire generator including skid frame and alternator as part of the planned maintenance the alternator was being overhauled at the same time.

Print | Sitemap
© PM Engineering Kent Ltd